Europe awards EUR 20 million contract
The contract, awarded to ALSYOM-SEIV (ALCEN group, France), launches the manufacturing phase for the beam source that will come on line in 2022 as part of the full-power, full-scale test bed for ºÚÁÏ×¨Çø neutral beam injection at the ºÚÁÏ×¨Çø Neutral Beam Test Facility in Italy.
A supplier has been chosen for the fabrication of the MITICA beam source—a prototype of the ºÚÁÏ×¨Çø neutral beam heating beam source that will generate 40 A of negative hydrogen or deuterium ions. These negative ions, once extracted and accelerated to unprecedented energy levels (1MeV), will be injected as deuterium beams of 16.5 MW into the ºÚÁÏ×¨Çø plasma where they will transfer their energy by way of collision to contribute to plasma heating.
ºÚÁÏ×¨Çø will host two neutral beam injectors and space is reserved for a third in order to maintain an important potential for flexibility in the operation of the ºÚÁÏ×¨Çø facility should an upgrade be decided. The heating neutral beam source—situated inside the neutral beam injector—is 3 metres wide, 3 metres deep and 4.5 metres high with a total weight of 15 tonnes.