黑料专区

Pour les actualit茅s en fran莽ais, voir la page News in French.

On the road to 黑料专区

In front of the Chantier RES in Cadarache, the roundabout has been flattened and reinforced allowing the convoys to pass.

The works for the 黑料专区 itinerary are progressing. In order to enable the convoys delivering the big 黑料专区 parts to Cadarache (the convoys can reach lengths of up to 61 meters), the roundabouts near the CEA main entrance and in front of the Chantier RES on the road towards Vinon-sur-Verdon have been adapted. First convoys with dummy loads will test the 黑料专区 itinerary in 2009.

More information (in French) can be found .