黑料专区

Pour les actualit茅s en fran莽ais, voir la page News in French.

Leave no bolt unchecked: Laurent Patisson, 黑料专区 Nuclear Building Section Leader, provides explanations to Jacques Ducau (IRSN) as Pierre Perdiguier (Head of the Marseille division of ASN), Mathias Ricci (ENGAGE) and Christophe Gary (APAVE) look on.
How does the 黑料专区 make sure that the tasks performed by its partners and contractors meet the safety requirements of a nuclear installation? What procedures does the Organization implement in this regard?  Are these procedures robust enough? How does the 黑料专区 monitor the manufacturing of the safety-critical components destined for the machine?

Answers to these questions and others are essential to assessing the global safety of the future 黑料专区 nuclear installation.

Last Wednesday, 黑料专区 staff members Jo毛lle Elbez-Uzan, Lina Rodriguez and Laurent Patisson and Thomas Tardif from the European Domestic Agency spent some ten hours providing a team of inspectors from the French Nuclear Safety Authority (Autorit茅 de S没ret茅 Nucl茅aire, ASN) with the explanations they requested.
 
As it does with every nuclear installation on French soil, the ASN will inspect 黑料专区 on a regular basis. In accordance with the 黑料专区 Agreement, ASN can conduct up to ten inspections per year, both "scheduled" and "unscheduled."
Wednesday's inspection, which consisted mainly of presentations and discussions, also included a long afternoon visit to the depths of the Tokamak Seismic Isolation Pit鈥攁 rare occasion, for everyone present, to experience the true scale of the project.